Showing posts with label Deck. Show all posts
Showing posts with label Deck. Show all posts

Friday, September 18, 2009

Deck Finished

The Deck is done.

All the rotted wood has been picked up at the curb. The garbage men here are really good at taking anything I put out and I take advantage of that. They took the old deck in 5 or 6 loads and saved me from having to cart it to the dump and pay to get rid of it. Over the past two months I've got all the old deck into smaller pieces and filled up 6 garbage cans and a number of recycling bins and they took every piece away.

The railing is completed on the new deck and we've put our table back up and started eating on it. Though it was a lot of extra work, the under deck mounted screws means the top surface looks great.

We are very happy with how it has turned out - I'm sure we'll get a number of years out of this deck.

A few things that will eventually be addressed :
  • boxing in the bottom of the columns for the roof to cover up the cement bases
  • lattice on the side of the deck under the railing
  • a trip hazard - open spot between the railing and the top deck stop on the sloping part of the railing
In any case the deck is done enough for now. I'll finish up other things before I get back to the deck.

Wednesday, September 9, 2009

Deck Replacement - Part 7

Here is the deck with two coats of blue on it. The blue is darker in 'real life', the flash lightened it up a bit. Since I put one coat of stain Superdeck stain on the decking boards before I installed them, they've all got 3 coats of stain. With the protection of the roof overhead I hope this stain will last at least as long as the 5 year guarantee.

The two coats took 1.5 gallons of stain and about 2-3 hours to put on. I did my best to stain in between the cracks of the decking boards as they were originally stained a lighter colour. We are really pleased with the end result.

After finishing I realized that I should have stained the risers on the stairs the tan colour to match the house - oh well, maybe next time (5 years?).

To finish up I need to re-install the railing that I took out for the staining, add a coat of stain to the railing and posts, and stain/paint that green cement step.

To really finish up I need to box in the cement at the bottom of the support posts for the roof and add a railing between the end of the (uninstalled) railing and the support post at the far end of the deck. Those two might take a bit longer.


Sunday, September 6, 2009

Deck Replacement - Part 6


The deck is finally finished!

Well, almost. Now it needs two coats of solid stain - the darker blue in the above picture. We originally picked the lighter greenish blue, but switched to the dark blue after we saw how the lighter colour looked.

The steps were quite a challenge and probably took more time than the rest of the deck. The rails are removed in the above picture, they and the posts are stained brown to match the house so I moved them out of the way for staining the rest of the deck.

I'm using Superdeck Solid Color & Stain, the same product I stained the house with. It has a 15 year guarantee on siding and 5 year on decks, so I'm hopeful it will last for awhile. The brown colour is a custom match with the house, the blue is 'Slate Blue'.

I really like how the Superdeck goes on, though it is a huge pain to try and clean the brushes and rollers I am using. I've been just putting the brush, roller and tray in plastic bags and keeping them in the fridge in between painting sessions. Keeping them in the fridge prevents the paint/stain from drying out. Once I'm done I'll throw out the brush and buy a new one - I tried cleaning one before when I stained the house and it was a waste of time.

Friday, August 28, 2009

Deck Replacement - Part 5

The deck is getting close to done now. I finished up the first level of stairs. I think the stairs are going to take longer than the rest of the deck. They are complicated by the fact that I am using the underdeck mounting brackets, and I can't screw the boards in when the stairs are in place. Instead I built up the framing, then I have to flip the framing up, attach the boards then put the framing back in place and bolt it down. I should be able to finish up the stairs this weekend - then I only need to put on another coat or two of stain...

Posted by Picasa

Wednesday, August 19, 2009

Deck Replacement - Part 4

The railing installation was no fun. The posts were easy enough to bolt to the joist, and cutting the pre-drilled rails to size was no problem. Lining up 14 metal balusters in between the two rails was a major PITA. After getting the all the balusters squeezed into the bottom rail, I started from one end, clamping the top rail into place and then lining up the other balusters one by one until I worked my way all the way across. This is definitely not something to try at the end of a long day - wait until you are fresh before trying this as it will try your patience.

In any case, we are very happy with the end result.


Once the railing was in place, I moved on to the wrap-around stairs. I built out the bottom stair as a box of 2x8s and then added the smaller step on top. The front of bottom box is bolted to a short 4x4 that is anchored to the concrete patio. The previous steps rested directly on the concrete and gravel ground and were rotten on the bottom (no surprise). The back end of the box is bolted to the deck structure and is again off the ground.

These steps and deck should last for a long time.



I placed some scrap plywood and OSB onto the steps for a temporary step as I won't be able to finish them up for a couple of days.


Wednesday, August 12, 2009

Deck Replacement - Part 3

On the last deck I built I used a hidden deck fastener to attach the deck boards and was very happy with the results. It definitely took more time to do the install, but I feel that the end result was worth the extra time.

For this deck I picked up the same product that I'd used previously - it's from Peak Products and is available at my local Home Depot. The Peak website says that it is only available in Canada, but it seems to be the similar to a product called 'Deckmaster' [amazon link]from Grabber. At about $3 each they were not outside my budget for this deck.

The rails come in 45" lengths and cut easily to size with tin snips.


Installation is a piece of cake. Lay them on top of the joists and put a 1 1/2" galvanized nail into every other hole.


The installation instructions say to alternate joist sides for adjacent rails. If you have any joists where the deck boards will meet end to end, then install a rail on each side of the joist.


As you can see from the pictures I've pre-stained my deck boards. It's a pain to do but I like that all four sides get stained. I'll add another coat on top after the install is complete.

After the rails are in, it probably takes about twice as long as hand screwing a deck from the top and maybe four times longer than if you are using a drill with an auto screw feeder. Again, I feel it's worth it for to have no screws on top of the deck. I'm hoping this deck will be around for at least 10-15 years, so a bit of extra time spent on the install will be worth it to me.

Once the rails are in, it's time to install the deck boards. I think the display at Home Depot has a picture of a guy installing the under deck screws by kneeling on an already installed board and leaning over to install the screw like this :


In reality, your only chance to get the screw in the hole is to crouch over like this :


It's not really practical and pretty slow. You could also try coming at it from the uninstalled portion of the deck - like this :


Again I find this difficult to get the screw in the hole and keep pressure on the impact driver to get it into the deck board.

The best way that I found to install the decking boards was to clamp the board in place, then slide under the deck (on a piece of cardboard) and drive the screws up from underneath. Even with a bare minimum of clearance I was able to squeeze under and get the job done. Not fun, but it's doable.


The holes on the rails are space about 1" apart and the installation instructions say to install two screws per joist. Depending on where your deck boards end up, you can usually put in three or four to hold down a particularly warped joist.

I like this product and will likely use it again if I move and have to build a new deck :)

Tuesday, August 11, 2009

Deck Replacement - Part 2

After tearing out the deck, the next step was to get support piers installed for the posts. Rather than burying the posts directly in the ground, I opted to install cement piers and attach the posts to the cement, above the ground with simpson hardware.

Rather than renting an auger and hauling and mixing the cement myself, I opted to get someone out to dig the holes and pour the cement for me. At $30 a hole for 6 holes it was well worth the money.

Once the holes were in, it was time to move onto properly installing the ledger board. I snapped a chalk line about 1 inch below the patio door and ran the circular saw along the line to start the cutout for the ledger board. Since I have wood siding, the siding should be cut away before the ledger board is attached to the house.

After removing the wood siding I found the OSB sheathing behind seemed a little rotten, so I ran the saw over that line again and removed the OSB. Behind that - yep more rot. The joist and sill were rotted and in dire need of replacement. All the joist under the patio door as well as 1'on the left and 2' on the right needed replacement. The sill plate needed replacement as well.


Luckily the other floor joists run parallel to this one, so I did not have to worry about the other joists when replacing this rotted one. A quick trip to the hardware store to pick up a new joist, PT sill, OSB and 'smart siding' to replace the wood siding and then back to work.

The old joist and sill was removed with a sawzall, then the new joist and sill slipped in. I was very surprised that I was able to remove the sill anchor nuts and reuse them. A little bit of break-free and the impact wrench pulled them off without difficulty.

I slid some flashing up under the wood siding to prevent water from getting behind the new ledger board. After applying some tar paper to replace the housewrap, Joshua jumped in to help me bolt the ledger board in place. It was actually in good shape and I was able to reuse it and the attached joist-hangers.


After the ledger board was installed I installed the OSB 'smart siding' product that matched close enough to my original wood siding. It'll be hidden under the deck and if I finish up the deck with a skirt it'll never be seen.

The new deck will have just about the same footprint as the old one, just a few feet wider to make more room for furniture on the deck. I installed the outer joists which were all new wood, and to save a few bucks reused the joist hangers from the old deck - not much fun removing those. A cat's paw and wonder bar helped me get them out in a reasonable amount of time with no damage.


Eventually I had all the joists filled in and was ready to start with the decking.

Monday, August 10, 2009

Deck Replacement - Part 1

When we moved into our house two years ago, I knew that the deck was in need of replacement. Though not in any real danger of falling off the house, there were rotted boards all over the place, and individual board replacement would not be enough to salvage this deck.

Age was part of the problem, the rest was due poor design and construction that left gaps for leaves, needles and keys from nearby trees to collect in. The gutters high above the deck also clogged with these same leaves and after clogging dumped the water directly onto the deck from two stories up.

We picked the wood up a few months ahead of when I would start the project, then stacked and stickered it in the garage to dry out a little. For outdoor projects I prefer to stain them before installation, letting me easily get all four sides of the wood and so I wanted to give the wood a chance to dry before staining. The 10% off sale was another good reason to buy the wood early.

The only part of the deck I planned on saving were the joists under the deck, as I figured everything else was too rotten to reuse. As I tore the deck apart I could see that I was right. The more I took out the more I could see how rotten it was.





Even the support posts were rotting out - having been buried directly in the ground a few snapped off at ground level when I tried to pull them out.


Eventually I ended up with a large pile of rotten wood and a much smaller pile of usable wood. Though the tops of most joists had some rot, I planned to flip them over to reuse them so only two of the joists were completely unusable.

After pulling the ledger board from the house I found the worst rot. The ledger was bolted directly to the house, against the wood siding. I'm glad it was at least bolted with galvanized bolts into the joist and not decking screws, but the siding was ruined behind and below the ledger board. Parts of it were so rotted that it crumbled when I touched it.