Once the subfloor preparation was complete, it was time to get the tiling done. I don't have much experience tiling, and the tiling that I have done has been pretty frustrating, but I had high hopes for this job. After spending a lot of time getting the subfloor nice and flat I figured that this job would go smoothly.
Well, it did. Mostly. Before I started I had to run out to Home Hardware to get some tile edging. Three pieces of 8' tile edging for $50. Once I got home I pulled the two 50 pound bags of thinset mortar out of the car that I'd bought the other day. Read the instructions to make sure I knew what I was doing and found that I'd bought the wrong thinset. I had unmodified thinset, which the instructions said not to use with porcelain tiles - and I'm putting down 13" porcelain tiles. Argh. Back to Home Hardware to buy three bags of poly-modified thinset, which they only have in 25 pound bags for $20 each, vs the 50 pound bag of unmodified I got earlier for $16 each. Double Argh.
After mixing up the thinset, I started laying tiles. I mixed the first batch of thinset a little thick, but the remainder went down no problem. I think this job ended up taking me three hours. I could have gone faster if I had someone to help mix the mortar, but I'm glad I got it finished.
Here's the completed job - a nice smooth, unbroken floor (inspector Oscar checks it out). Hmm, wasn't there a vent there somewhere. Oops.
After the tiles dried for a couple of days I did the grouting. Well, first I cut out two cracked tiles and the third tile that covered the vent. The grouting took longer than I thought it would. First, the grout we had was the color of, well, brown. So of to Home Depot to pick up some new grout. After getting started late (again), it took me about 45 minutes to put the grout down. I cleaned up my tools and got back to the floor to sponge off the excess grout.
I must have waited too long to clean off the grout, because I had to scrub the floor for another hour and a half to get off all the grout. That was the opposite of fun. As you can see, inspector Oscar is always close at hand to make sure I am doing quality work.
Here's the completed floor. I still need to make up a crawlspace cover.
Here's the new vent hole. I tried plunge cutting the porcelain tile with a 4" diamond blade on an angle grinder but could not get the hole cut without breaking the tile. After three tries I gave up and went with the below instead.
A blog to show my latest woodworking and home renovation projects. Some running posts may be snuck in as well.
Showing posts with label Home Renovation. Show all posts
Showing posts with label Home Renovation. Show all posts
Monday, June 14, 2010
Friday, June 11, 2010
Laundry Room Upgrade - Part 2
After finishing up the drywall with four coats of drywall compound, I was ready to paint. I started with a coat on all of the new drywall and any area that was patched. The walls that were previously covered in wallpaper already had a good coat of primer so I left those alone. There were a few brown spots on the ceiling where there were previously cabinets, so I primed those to cut down on the number of finish coats I'd need. You can see one of the brown spots above my head in the picture below.
The floor was the next thing to tackle. We'll be putting in a 13" porcelain tiles, so I need a strong, flat sub-floor to support the tile. The original floor was : 3/4" tongue and groove planking (original), 1/2" particle board, two sheets of 1/4" plywood. All fastened together with a bazillion nails. I tried just ripping up the plywood and particle board, but it was coming up in fist size pieces due to all the nails.
After giving up on the 'easy' way of ripping out just the plywood, I pulled out my circular saw and sawzall and got to work. First I used the circular saw (and a cheap blade) to cut through the floor adjacent to each stud. Then, a large prybar and sledgehammer to pull the floor up far enough from the joist to cut the nails securing it to the joist. A couple of hours, sweat and blood and I was able to get the floor removed and piled up outside the door.
Here is the naked floor. A quick check with string showed me that it was bowed up to 1/2" in the middle. I didn't want to impede on the floor space in the crawl below, so I decided to sister the 2x8 joists with some 2x6s in order to even out the floor. With a string line stretched across the top of the existing joists to help line them up, I added a 2x6 to each of the original joists with construction adhesive and screws. I had to notch the bottom of a couple of the 2x6s to clear wiring in the original joists.
After I finished flattening the floor, I put down two layers of 5/8" tongue and groove plywood for the subfloor - the first was glued and screwed to the joists, the second only screwed to the first layer. On top of that I attached 3/8 fiberock with mortar and rink shanked nails. Now the floor is ready for tile.
The floor was the next thing to tackle. We'll be putting in a 13" porcelain tiles, so I need a strong, flat sub-floor to support the tile. The original floor was : 3/4" tongue and groove planking (original), 1/2" particle board, two sheets of 1/4" plywood. All fastened together with a bazillion nails. I tried just ripping up the plywood and particle board, but it was coming up in fist size pieces due to all the nails.
After giving up on the 'easy' way of ripping out just the plywood, I pulled out my circular saw and sawzall and got to work. First I used the circular saw (and a cheap blade) to cut through the floor adjacent to each stud. Then, a large prybar and sledgehammer to pull the floor up far enough from the joist to cut the nails securing it to the joist. A couple of hours, sweat and blood and I was able to get the floor removed and piled up outside the door.
Here is the naked floor. A quick check with string showed me that it was bowed up to 1/2" in the middle. I didn't want to impede on the floor space in the crawl below, so I decided to sister the 2x8 joists with some 2x6s in order to even out the floor. With a string line stretched across the top of the existing joists to help line them up, I added a 2x6 to each of the original joists with construction adhesive and screws. I had to notch the bottom of a couple of the 2x6s to clear wiring in the original joists.
After I finished flattening the floor, I put down two layers of 5/8" tongue and groove plywood for the subfloor - the first was glued and screwed to the joists, the second only screwed to the first layer. On top of that I attached 3/8 fiberock with mortar and rink shanked nails. Now the floor is ready for tile.
Thursday, June 10, 2010
Laundry Room Upgrade - Part 1
In our house, the Laundry Room and the Kitchen are the most dated and upgrade ready rooms in the house.
The kitchen cupboards are 80's melamine with a mirrored backsplash and laminate counter tops. The ceramic floor tiles are cracked and loose, the layout is too spread out and the walls are a dark brown.
The attached laundry room has ugly as heck wallpaper, awkwardly sized home made cabinets of dubious quality and a wavy vinyl floor.
This year's major house renovations will be to completely redo the kitchen and laundry rooms. We'll start with the laundry room - once it is fixed up I'll setup a temporary sink in there and tear apart the kitchen.
First, a few before shots of the laundry room. Nice wallpaper!
I had hoped to tear out the cabinets, strip out the wallpaper, the patch and paint the walls. Unfortunately I found a surprise when I tore out the cabinets - part of the wall was cinder block. The remainder of the wall was plaster directly attached to the cinder block which is beyond my skills to replicate. Parts of the cinder block were on the same plane as the plaster in the adjacent wall (to the right) so there was no way I could just add drywall to cover the cinder blocks - I'd have to cover the entire wall with drywall.
Finishing drywall is definitely not a skill I've mastered very well so I knew this would be a bit of a challenge. I called a guy who's done some other drywall work for me but he decided to retire from drywall earlier in the month so I was on my own. I started by strapping the walls with some 1x3s, using construction adhesive and screws to attach the strapping to the plaster.
The ends of the 1x3 were attached to the cinder blocks with a powdered actuated fastener (Hilti DX 36). I used cedar wedges to fur out the 1x3s on the cinder block so then lined up with the strapping on the plaster.
Once the strapping was in place, it was time to add the drywall. Two sheets of 4x10 1/2" drywall covered this wall, I needed one other 4x8 sheet to cover up some plaster on the opposite wall.
I scoured the web for about an hour to brush up on my drywall finishing knowledge, here's a few sites I liked :
- This Old House - How to Finish Drywall
- Hometime - Drywall
- DrywallInfo.com
After the drywall was hung, Joshua gave me a hand taping the joints. I used paper tape for the flat seam and preformed metal corner beads for the corner and ceiling.
Friday, September 18, 2009
Deck Finished
The Deck is done.
All the rotted wood has been picked up at the curb. The garbage men here are really good at taking anything I put out and I take advantage of that. They took the old deck in 5 or 6 loads and saved me from having to cart it to the dump and pay to get rid of it. Over the past two months I've got all the old deck into smaller pieces and filled up 6 garbage cans and a number of recycling bins and they took every piece away.
The railing is completed on the new deck and we've put our table back up and started eating on it. Though it was a lot of extra work, the under deck mounted screws means the top surface looks great.
We are very happy with how it has turned out - I'm sure we'll get a number of years out of this deck.
A few things that will eventually be addressed :
All the rotted wood has been picked up at the curb. The garbage men here are really good at taking anything I put out and I take advantage of that. They took the old deck in 5 or 6 loads and saved me from having to cart it to the dump and pay to get rid of it. Over the past two months I've got all the old deck into smaller pieces and filled up 6 garbage cans and a number of recycling bins and they took every piece away.
The railing is completed on the new deck and we've put our table back up and started eating on it. Though it was a lot of extra work, the under deck mounted screws means the top surface looks great.
We are very happy with how it has turned out - I'm sure we'll get a number of years out of this deck.
A few things that will eventually be addressed :
- boxing in the bottom of the columns for the roof to cover up the cement bases
- lattice on the side of the deck under the railing
- a trip hazard - open spot between the railing and the top deck stop on the sloping part of the railing
Wednesday, September 9, 2009
Deck Replacement - Part 7
Here is the deck with two coats of blue on it. The blue is darker in 'real life', the flash lightened it up a bit. Since I put one coat of stain Superdeck stain on the decking boards before I installed them, they've all got 3 coats of stain. With the protection of the roof overhead I hope this stain will last at least as long as the 5 year guarantee.
The two coats took 1.5 gallons of stain and about 2-3 hours to put on. I did my best to stain in between the cracks of the decking boards as they were originally stained a lighter colour. We are really pleased with the end result.
After finishing I realized that I should have stained the risers on the stairs the tan colour to match the house - oh well, maybe next time (5 years?).
To finish up I need to re-install the railing that I took out for the staining, add a coat of stain to the railing and posts, and stain/paint that green cement step.
To really finish up I need to box in the cement at the bottom of the support posts for the roof and add a railing between the end of the (uninstalled) railing and the support post at the far end of the deck. Those two might take a bit longer.
The two coats took 1.5 gallons of stain and about 2-3 hours to put on. I did my best to stain in between the cracks of the decking boards as they were originally stained a lighter colour. We are really pleased with the end result.
After finishing I realized that I should have stained the risers on the stairs the tan colour to match the house - oh well, maybe next time (5 years?).
To finish up I need to re-install the railing that I took out for the staining, add a coat of stain to the railing and posts, and stain/paint that green cement step.
To really finish up I need to box in the cement at the bottom of the support posts for the roof and add a railing between the end of the (uninstalled) railing and the support post at the far end of the deck. Those two might take a bit longer.
Sunday, September 6, 2009
Deck Replacement - Part 6
The deck is finally finished!
Well, almost. Now it needs two coats of solid stain - the darker blue in the above picture. We originally picked the lighter greenish blue, but switched to the dark blue after we saw how the lighter colour looked.
The steps were quite a challenge and probably took more time than the rest of the deck. The rails are removed in the above picture, they and the posts are stained brown to match the house so I moved them out of the way for staining the rest of the deck.
I'm using Superdeck Solid Color & Stain, the same product I stained the house with. It has a 15 year guarantee on siding and 5 year on decks, so I'm hopeful it will last for awhile. The brown colour is a custom match with the house, the blue is 'Slate Blue'.
I really like how the Superdeck goes on, though it is a huge pain to try and clean the brushes and rollers I am using. I've been just putting the brush, roller and tray in plastic bags and keeping them in the fridge in between painting sessions. Keeping them in the fridge prevents the paint/stain from drying out. Once I'm done I'll throw out the brush and buy a new one - I tried cleaning one before when I stained the house and it was a waste of time.
Friday, August 28, 2009
Deck Replacement - Part 5
The deck is getting close to done now. I finished up the first level of stairs. I think the stairs are going to take longer than the rest of the deck. They are complicated by the fact that I am using the underdeck mounting brackets, and I can't screw the boards in when the stairs are in place. Instead I built up the framing, then I have to flip the framing up, attach the boards then put the framing back in place and bolt it down. I should be able to finish up the stairs this weekend - then I only need to put on another coat or two of stain...
Wednesday, August 19, 2009
Deck Replacement - Part 4
The railing installation was no fun. The posts were easy enough to bolt to the joist, and cutting the pre-drilled rails to size was no problem. Lining up 14 metal balusters in between the two rails was a major PITA. After getting the all the balusters squeezed into the bottom rail, I started from one end, clamping the top rail into place and then lining up the other balusters one by one until I worked my way all the way across. This is definitely not something to try at the end of a long day - wait until you are fresh before trying this as it will try your patience.
In any case, we are very happy with the end result.

Once the railing was in place, I moved on to the wrap-around stairs. I built out the bottom stair as a box of 2x8s and then added the smaller step on top. The front of bottom box is bolted to a short 4x4 that is anchored to the concrete patio. The previous steps rested directly on the concrete and gravel ground and were rotten on the bottom (no surprise). The back end of the box is bolted to the deck structure and is again off the ground.
These steps and deck should last for a long time.
I placed some scrap plywood and OSB onto the steps for a temporary step as I won't be able to finish them up for a couple of days.
In any case, we are very happy with the end result.
Once the railing was in place, I moved on to the wrap-around stairs. I built out the bottom stair as a box of 2x8s and then added the smaller step on top. The front of bottom box is bolted to a short 4x4 that is anchored to the concrete patio. The previous steps rested directly on the concrete and gravel ground and were rotten on the bottom (no surprise). The back end of the box is bolted to the deck structure and is again off the ground.
These steps and deck should last for a long time.
I placed some scrap plywood and OSB onto the steps for a temporary step as I won't be able to finish them up for a couple of days.
Wednesday, August 12, 2009
Deck Replacement - Part 3
On the last deck I built I used a hidden deck fastener to attach the deck boards and was very happy with the results. It definitely took more time to do the install, but I feel that the end result was worth the extra time.
For this deck I picked up the same product that I'd used previously - it's from Peak Products and is available at my local Home Depot. The Peak website says that it is only available in Canada, but it seems to be the similar to a product called 'Deckmaster' [amazon link
]from Grabber. At about $3 each they were not outside my budget for this deck.
The rails come in 45" lengths and cut easily to size with tin snips.

Installation is a piece of cake. Lay them on top of the joists and put a 1 1/2" galvanized nail into every other hole.

The installation instructions say to alternate joist sides for adjacent rails. If you have any joists where the deck boards will meet end to end, then install a rail on each side of the joist.

As you can see from the pictures I've pre-stained my deck boards. It's a pain to do but I like that all four sides get stained. I'll add another coat on top after the install is complete.
After the rails are in, it probably takes about twice as long as hand screwing a deck from the top and maybe four times longer than if you are using a drill with an auto screw feeder. Again, I feel it's worth it for to have no screws on top of the deck. I'm hoping this deck will be around for at least 10-15 years, so a bit of extra time spent on the install will be worth it to me.
Once the rails are in, it's time to install the deck boards. I think the display at Home Depot has a picture of a guy installing the under deck screws by kneeling on an already installed board and leaning over to install the screw like this :

In reality, your only chance to get the screw in the hole is to crouch over like this :

It's not really practical and pretty slow. You could also try coming at it from the uninstalled portion of the deck - like this :

Again I find this difficult to get the screw in the hole and keep pressure on the impact driver to get it into the deck board.
The best way that I found to install the decking boards was to clamp the board in place, then slide under the deck (on a piece of cardboard) and drive the screws up from underneath. Even with a bare minimum of clearance I was able to squeeze under and get the job done. Not fun, but it's doable.

The holes on the rails are space about 1" apart and the installation instructions say to install two screws per joist. Depending on where your deck boards end up, you can usually put in three or four to hold down a particularly warped joist.
I like this product and will likely use it again if I move and have to build a new deck :)
For this deck I picked up the same product that I'd used previously - it's from Peak Products and is available at my local Home Depot. The Peak website says that it is only available in Canada, but it seems to be the similar to a product called 'Deckmaster' [amazon link
The rails come in 45" lengths and cut easily to size with tin snips.
Installation is a piece of cake. Lay them on top of the joists and put a 1 1/2" galvanized nail into every other hole.
The installation instructions say to alternate joist sides for adjacent rails. If you have any joists where the deck boards will meet end to end, then install a rail on each side of the joist.
As you can see from the pictures I've pre-stained my deck boards. It's a pain to do but I like that all four sides get stained. I'll add another coat on top after the install is complete.
After the rails are in, it probably takes about twice as long as hand screwing a deck from the top and maybe four times longer than if you are using a drill with an auto screw feeder. Again, I feel it's worth it for to have no screws on top of the deck. I'm hoping this deck will be around for at least 10-15 years, so a bit of extra time spent on the install will be worth it to me.
Once the rails are in, it's time to install the deck boards. I think the display at Home Depot has a picture of a guy installing the under deck screws by kneeling on an already installed board and leaning over to install the screw like this :
In reality, your only chance to get the screw in the hole is to crouch over like this :
It's not really practical and pretty slow. You could also try coming at it from the uninstalled portion of the deck - like this :
Again I find this difficult to get the screw in the hole and keep pressure on the impact driver to get it into the deck board.
The best way that I found to install the decking boards was to clamp the board in place, then slide under the deck (on a piece of cardboard) and drive the screws up from underneath. Even with a bare minimum of clearance I was able to squeeze under and get the job done. Not fun, but it's doable.
The holes on the rails are space about 1" apart and the installation instructions say to install two screws per joist. Depending on where your deck boards end up, you can usually put in three or four to hold down a particularly warped joist.
I like this product and will likely use it again if I move and have to build a new deck :)
Tuesday, August 11, 2009
Deck Replacement - Part 2
After tearing out the deck, the next step was to get support piers installed for the posts. Rather than burying the posts directly in the ground, I opted to install cement piers and attach the posts to the cement, above the ground with simpson hardware.
Rather than renting an auger and hauling and mixing the cement myself, I opted to get someone out to dig the holes and pour the cement for me. At $30 a hole for 6 holes it was well worth the money.
Once the holes were in, it was time to move onto properly installing the ledger board. I snapped a chalk line about 1 inch below the patio door and ran the circular saw along the line to start the cutout for the ledger board. Since I have wood siding, the siding should be cut away before the ledger board is attached to the house.
After removing the wood siding I found the OSB sheathing behind seemed a little rotten, so I ran the saw over that line again and removed the OSB. Behind that - yep more rot. The joist and sill were rotted and in dire need of replacement. All the joist under the patio door as well as 1'on the left and 2' on the right needed replacement. The sill plate needed replacement as well.

Luckily the other floor joists run parallel to this one, so I did not have to worry about the other joists when replacing this rotted one. A quick trip to the hardware store to pick up a new joist, PT sill, OSB and 'smart siding' to replace the wood siding and then back to work.
The old joist and sill was removed with a sawzall, then the new joist and sill slipped in. I was very surprised that I was able to remove the sill anchor nuts and reuse them. A little bit of break-free and the impact wrench pulled them off without difficulty.
I slid some flashing up under the wood siding to prevent water from getting behind the new ledger board. After applying some tar paper to replace the housewrap, Joshua jumped in to help me bolt the ledger board in place. It was actually in good shape and I was able to reuse it and the attached joist-hangers.

After the ledger board was installed I installed the OSB 'smart siding' product that matched close enough to my original wood siding. It'll be hidden under the deck and if I finish up the deck with a skirt it'll never be seen.
The new deck will have just about the same footprint as the old one, just a few feet wider to make more room for furniture on the deck. I installed the outer joists which were all new wood, and to save a few bucks reused the joist hangers from the old deck - not much fun removing those. A cat's paw
and wonder bar
helped me get them out in a reasonable amount of time with no damage.

Eventually I had all the joists filled in and was ready to start with the decking.
Rather than renting an auger and hauling and mixing the cement myself, I opted to get someone out to dig the holes and pour the cement for me. At $30 a hole for 6 holes it was well worth the money.
Once the holes were in, it was time to move onto properly installing the ledger board. I snapped a chalk line about 1 inch below the patio door and ran the circular saw along the line to start the cutout for the ledger board. Since I have wood siding, the siding should be cut away before the ledger board is attached to the house.
After removing the wood siding I found the OSB sheathing behind seemed a little rotten, so I ran the saw over that line again and removed the OSB. Behind that - yep more rot. The joist and sill were rotted and in dire need of replacement. All the joist under the patio door as well as 1'on the left and 2' on the right needed replacement. The sill plate needed replacement as well.
Luckily the other floor joists run parallel to this one, so I did not have to worry about the other joists when replacing this rotted one. A quick trip to the hardware store to pick up a new joist, PT sill, OSB and 'smart siding' to replace the wood siding and then back to work.
The old joist and sill was removed with a sawzall, then the new joist and sill slipped in. I was very surprised that I was able to remove the sill anchor nuts and reuse them. A little bit of break-free and the impact wrench pulled them off without difficulty.
I slid some flashing up under the wood siding to prevent water from getting behind the new ledger board. After applying some tar paper to replace the housewrap, Joshua jumped in to help me bolt the ledger board in place. It was actually in good shape and I was able to reuse it and the attached joist-hangers.
After the ledger board was installed I installed the OSB 'smart siding' product that matched close enough to my original wood siding. It'll be hidden under the deck and if I finish up the deck with a skirt it'll never be seen.
The new deck will have just about the same footprint as the old one, just a few feet wider to make more room for furniture on the deck. I installed the outer joists which were all new wood, and to save a few bucks reused the joist hangers from the old deck - not much fun removing those. A cat's paw
Eventually I had all the joists filled in and was ready to start with the decking.
Monday, August 10, 2009
Deck Replacement - Part 1
When we moved into our house two years ago, I knew that the deck was in need of replacement. Though not in any real danger of falling off the house, there were rotted boards all over the place, and individual board replacement would not be enough to salvage this deck.
Age was part of the problem, the rest was due poor design and construction that left gaps for leaves, needles and keys from nearby trees to collect in. The gutters high above the deck also clogged with these same leaves and after clogging dumped the water directly onto the deck from two stories up.
We picked the wood up a few months ahead of when I would start the project, then stacked and stickered it in the garage to dry out a little. For outdoor projects I prefer to stain them before installation, letting me easily get all four sides of the wood and so I wanted to give the wood a chance to dry before staining. The 10% off sale was another good reason to buy the wood early.
The only part of the deck I planned on saving were the joists under the deck, as I figured everything else was too rotten to reuse. As I tore the deck apart I could see that I was right. The more I took out the more I could see how rotten it was.


Even the support posts were rotting out - having been buried directly in the ground a few snapped off at ground level when I tried to pull them out.

Eventually I ended up with a large pile of rotten wood and a much smaller pile of usable wood. Though the tops of most joists had some rot, I planned to flip them over to reuse them so only two of the joists were completely unusable.
After pulling the ledger board from the house I found the worst rot. The ledger was bolted directly to the house, against the wood siding. I'm glad it was at least bolted with galvanized bolts into the joist and not decking screws, but the siding was ruined behind and below the ledger board. Parts of it were so rotted that it crumbled when I touched it.
Age was part of the problem, the rest was due poor design and construction that left gaps for leaves, needles and keys from nearby trees to collect in. The gutters high above the deck also clogged with these same leaves and after clogging dumped the water directly onto the deck from two stories up.
We picked the wood up a few months ahead of when I would start the project, then stacked and stickered it in the garage to dry out a little. For outdoor projects I prefer to stain them before installation, letting me easily get all four sides of the wood and so I wanted to give the wood a chance to dry before staining. The 10% off sale was another good reason to buy the wood early.
The only part of the deck I planned on saving were the joists under the deck, as I figured everything else was too rotten to reuse. As I tore the deck apart I could see that I was right. The more I took out the more I could see how rotten it was.
Even the support posts were rotting out - having been buried directly in the ground a few snapped off at ground level when I tried to pull them out.
Eventually I ended up with a large pile of rotten wood and a much smaller pile of usable wood. Though the tops of most joists had some rot, I planned to flip them over to reuse them so only two of the joists were completely unusable.
After pulling the ledger board from the house I found the worst rot. The ledger was bolted directly to the house, against the wood siding. I'm glad it was at least bolted with galvanized bolts into the joist and not decking screws, but the siding was ruined behind and below the ledger board. Parts of it were so rotted that it crumbled when I touched it.
Thursday, August 30, 2007
Hardwood Floor Install - Oops
I finished installing hardwood floor in Joshua's bedroom last night. I'm about halfway done the 1800 sq ft install (2nd bedroom + hallway are left). It's gone really well and I am very pleased how it is turning out.
The flooring is 3.25" prefinished Bruce, stained cherry. Not the best quality but a good price and it looks nice once installed.
I've been laying down 15# felt atop the plywood subfloor, usually one 3 ft row of felt at a time, tacking it in place then laying the hardwood before laying the next row of felt out.
Somewhere here :
Oops.
Wednesday, August 29, 2007
Hardwood Patching / Refinishing
Over the weekend, I finished up the last time sensitive project that I had to complete. The original hardwood floors downstairs needed to be refinished, but before we could do that there was some patching to do.
The wall moving and a suspected dog stain meant two high traffic areas needed to be patched. There was also a hole in the closet, likely from the original floor plan being modified that needed a few boards to patch as well.
The first step was removing all the cut pieces around the area where the wall was in the now hallway. I used a circular saw to cut the pieces where they disappeared under the tiled bathroom floor and then a pry bar and hammer to pull them out as intact as possible.
Many of the pieces were unusable due to excessive nail or screw holes from the carpet or the closet hardware. Salvageable pieces I pulled the nails out and cut the ends square so they could be reused.
I ended up needing 20 more square feet to patch the blank areas. I could only find one local hardwood dealer that carried unfinished red oak flooring which naturally cost more than the prefinished Bruce oak that we are installing in the rest of the house. Having now installed both the prefinished and unfinished I can see the quality is much higher in the unfinished. The lack of the v-groove is also very nice. Since the floor has not been finished yet I don't know for sure, but it seemed to me that the unfinished floor will turn out much nicer than the pre-finished.
The dog stain area was a PITA to patch as it was in the middle of the floor. More than one flooring person who came to quote our job told us that it would have to be patched, that it was likely the stain was deep in the wood. I thought about sanding it down a bit and checking before patching but never got around to it. When I cut the old boards out I could immediately see that they did not need to be ripped out. By then it was too late and they were in pieces. The dog stain had not penetrated at all into the wood. Nuts.
Before and after pictures of the hallway. The after is only sanded, with no finish yet. I am amazed at how well the old and new wood blends.
Friday, August 17, 2007
Hardwood Install - Done?
Subscribe to: